Field Runoff After Rain Worksheet
Runoff is a signal. Where it forms, how fast it moves and how muddy it looks tell you more about erosion risk than a map does. This worksheet organizes what you see in the first hour of a storm and the day after.
Prepare
- Set a rain gauge in the open away from trees, and check it the same day. A straight-sided can works if you measure with a ruler.
- Keep a notebook, a camera and rubber boots in the truck.
- Pick two or three stations to observe: a field low point, a waterway inlet and a field outlet.
- If safe, observe during the storm. Never wade through fast water or work near lightning.
What to record during and after
- Rainfall total and intensity: light, moderate, heavy, or inches per hour if you can estimate.
- Soil moisture before the storm and surface condition: crusted, residue covered, freshly tilled.
- Time to first runoff after rain starts.
- Water color: clear, tea, brown, thick. Heavy brown water means sediment loss.
- Rills, gullies or sheet erosion, with approximate depth and length.
- Deposition: where soil settled, such as at the field edge or in a ditch.
- How long ponding lasted.
Runoff record
| Date | Rain (in) | Intensity | Station | Time to runoff | Water color | Erosion observed |
|---|---|---|---|---|---|---|
Reading the evidence
Fast runoff on a residue-covered field points to compaction, a restrictive layer or frozen ground; fast runoff on bare soil suggests crusting. Clear water that appears late may mean good infiltration. Concentrated flow lines that cut across rows suggest rows are running downslope; contouring or cover may help. Compare similar storms before and after a practice change rather than comparing a spring downpour with a summer shower.
Photograph rills with a ruler for scale. A rill deeper than a few inches or channels that tillage cannot smooth call for more than a quick fix, such as a grassed waterway or terrace; ask NRCS for help.
Example entry
June 14, 1.6 inches in 50 minutes. Corn at V4, soil crusted after earlier planting pass. Runoff began 12 minutes into the storm. Water at the field outlet was the color of coffee with cream. Rills 2 inches deep ran for 40 feet down the west slope. Action: add cover crop to the west half and ask NRCS about a diversion. Follow-up after the next 1-inch rain.
Follow-up actions
Write a short action list: reseed bare spots, adjust row direction, add residue cover, repair waterway outlets. After the next rain, repeat the observation and note whether the pattern changed. Over a year you will have a record of which fields leak water and soil, which supports planning and cost-share requests.
Authoritative references
More farm stories, humor and news: farm.FM Farming.