Soil Health School

Water Erosion Rill and Gully Log

Rills are small channels you can erase with tillage. Gullies are bigger and cannot. Measuring both turns an eyesore into data you can use to prioritize practices and ask for help.

Classify what you see

TypeTypical sizeManagement
Sheet erosionThin, uniform soil removal; exposed roots, pedestalsCover, residue, contour
RillLess than about 4 inches deepResidue, cover, contour; tillage can smooth
Ephemeral gullyLarger channel in the same flow path each yearGrassed waterway or similar structure
Classic gullyDeep and permanent, often headcuttingEngineered repair and exclusion

Measure

  1. Mark the start and end of the channel with flags or GPS.
  2. Measure length with a tape or wheel.
  3. Measure average width and depth at three or more points.
  4. Estimate cross-sectional area (width × depth ÷ 2 for a V-shaped channel, or width × depth for rectangular).
  5. Volume = average area × length. Soil lost in tons is about volume in cubic feet × 80 ÷ 2000 for typical soils.
  6. Photograph each channel with a ruler and landmarks.

Log

DateField and locationTypeLength (ft)Avg width and depth (in)Volume (ft³)CauseAction
        
        
        
        
        
        
        
        

Example

A rill 120 feet long, 6 inches wide and 3 inches deep forms a V shape with an area of 9 square inches, or 0.0625 square feet. Volume is 7.5 cubic feet, about 600 pounds of soil (7.5 ft³ × 80 lb per ft³). A small amount, but if the same rill appears in every storm along the same line, it indicates concentrated flow that conservation practices need to address.

Prioritizing repairs

Rank sites by soil loss, risk to structures or water and cost to fix. A small rill that recurs in the same place may be fixed by seeding grass or adding a diversion; a deep gully near a stream or road may need engineering and permits. Contact NRCS early, since cost-share, planning and approvals take time. Track repairs and results, and reinspect after major storms.

Responding

Fill small rills with soil and reseed or let cover crops help. For ephemeral gullies, consider a grassed waterway, diversion or terrace, with technical help from NRCS. Look upslope for the cause: long slope length, bare soil, compaction or a concentrated outlet from a road or building. Do not just fill gullies repeatedly. Record repairs and results, and check after the next heavy storm. Keep photos and logs for cost-share applications.

Authoritative references

More farm stories, humor and news: farm.FM Farming.